I refer to the article “Khaw Boon Wan sets new rail network reliability target as MRT becomes three times as dependable as in 2015” (Straits Times, Jul 27).

Ownself delude ownself?

The article writes, “The MRT system’s reliability has improved by three times since Mr Khaw Boon Wan moved to the Transport Ministry in 2015, but the minister wants to raise the bar much higher.

Speaking at the fourth joint forum on infrastructure maintenance organised by SMRT on Thursday (July 26), the Coordinating Minister for Infrastructure and Minister for Transport said that in 2015 – the year he replaced Mr Lui Tuck Yew at the ministry, Singapore’s MRT trains travelled an average of 133,000km between delays of more than five minutes.

This is known as mean km between failure (MKBF).”

Ownself exclude ownself?

It was noted by Mr Khaw that the MKBF “has happily gone up to nearly 400,000 (393,000) train-km” in the first half of this year (2017) based on preliminary data, and had also excluded delays arising from the testing of a new signalling system on the North-South line.

The minister noted that all five lines had improved, with the star performer being the North-East line, which clocked nearly 1 million (978,000) train-km between failures.

“This is a satisfactory outcome, against our targets of 300,000 MKBF this year, 400,000 MKBF next year and 800,000 train-km by 2020,” Mr Khaw said, adding that he set these targets last year against the best-in-class Taipei Metro, which clocked 800,000 MKBF.

But by excluding the “delays arising from the testing of a new signalling system, we have conveniently evaded all the frequent and extensive delays that have happened recently. Does the Taipei Metro exclude delays due to certain reasons like what we are now doing in Singapore?

Ownself praise ownself?

Noting that the Taipei Metro has improved further by achieving 1 million MKBF, Mr Khaw declared that he will be upping their 2020 target from 800,000 to 1,000,000 train-km. Noting that LTA (Land Transport Authority) and the operators are working closely towards this target.

At one million train-km, the system would be 7.5 times “more reliable” than it was in 2015. But if we count the delays due to “testing of a new signalling system” – how many times less reliable are we now?

Ownself deny ownself?

The minister noted that the number of major breakdowns (those lasting more than 30 minutes) had also fallen to three in the first half, from 10 same period last year. These exclude the numerous delays arising from resignalling tests on the North-south line.

Mr Khaw said the London Underground and Taipei Metro had forewarned of teething problems when a new signalling system is installed, and that he had highlighted this in Parliament early this year. “While there will still be delays, if we have done our best to minimise them, I am sure Singaporeans will be understanding and forgiving,” said Mr Khaw and notes that the overall resignalling programme has been “smoother than what we had feared” with progressive software upgrades.

Ownself don’t blame ownself?

Mr Khaw in his speech did not include the major disruption on 28 June which he said was caused by a error on the part of Thales – the system supplier.

“By mistake, a Thales’ engineering team connected an incompatible radio to the radio backbone network of the North-South line and the Tuas West Extension… This caused a sudden congestion on the network which resulted in all North-South line and Tuas West Extension trains “losing radio communications”.

Ownself dreaming ownself?

The minister said, “We have all learnt from this, and such an error will not happen again,” and added that the new signalling system should stabilise before year-end “if there are no new surprises”.

Resignalling on the East-West line will follow after that, and that exercise “should be faster, as we can port over the lessons from our experience in North-South line”

Subscribe
Notify of
0 Comments
Inline Feedbacks
View all comments
You May Also Like

The need to look at the use of alternative tobacco products to quit smoking

It is 2018 and humankind still finds itself unable to rid itself…

Shrinking demand for HDB BTO flats: Based on fact and figures?

By S Y Lee and Leong Sze Hian We refer to media…

Has Koh Poh Koon been too quick to reject compensation for KTPH breast cancer misdiagnosis patients?

In December last year, Khoo Teck Puat Hospital (KTPH) disclosed that approximately…

Commuters outraged as EWL disruptes during morning rush hour

Singapore Mass Rapid Transit (SMRT) announced In its Twitter account this morning, that…