When the much anticipated integrated transport hub in Yishun opened on Sunday (8 September), commuters were expected a smoother journey for their morning commute. Unfortunately for them, on Monday morning they were instead faced with a massive traffic jam as multiple lanes of busses were caught in a bottleneck trying to enter the new hub.
One Twitter user shared a short video clip of the jam that stretched on for what looked like several hundred metres.


There were also many tweets from irate commuters and passers-by who were shocked at the state of the traffic jam which caused bad delays during morning rush hour:
 


One user even declared the Yishun interchange to be the worst in Singapore:
https://twitter.com/rtjk123/status/1171028636809355267
The Yishun ITH – 10th transport hub in Singapore – connects to the Yishun MRT station via an underpass and is integrated with Northpoint City shopping centre. It is fully ‘barrier-free’, according to the Land Transport Authority (LTA). In the run-up to the opening, the hub was touted as being commuter-friendly and having inclusive facilities.
The interchange boasts dedicated boarding points and wheelchair-friendly graduated kerb edges. There are also priority zones with seats, a nursing room, and barrier-free toilets to cater for the elderly, less mobile and families with young children.
There are also ‘Heart Zones’ for commuters who require assistance to indicate their needs as well as a room set aside for special needs commuters who need a quiet and calming space. For those who cycle to the hub, there are close to 600 bicycle parking lots in the vicinity of the interchange.
When it was announced, the LTA said that Yishun ITH would be built in accordance with the Building Construction Authority’s Green Mark Gold Plus standard, which features things like LED lighting and a water-cooled air-conditioning system.
Most importantly, though, is that the Yishun ITH, managed by SMRT Buses Limited, was announced as part of the LTA’s plan to improve Singapore’s public transport system to ease congestion. Back in 2011, Transport Minister Raymond Lim said that one of the efforts being made was making the integration between the rail and bus networks more seamless by building more integrated transport hubs over the next few years, including this one in Yishun.
Turns out the Yishun ITH still has some kinks to work out.

Subscribe
Notify of
0 Comments
Inline Feedbacks
View all comments
You May Also Like

“Why double standards?”: Netizens slam Govt for exempting World Economic Forum attendees from SHN period

Attendees at the World Economic Forum’s (WEF) special annual meeting in August…

NMP Kuik Shiao-yin calls upon S’poreans to help one another during these troubled times

On Tuesday (17 March), Nominated Member of Parliament (NMP) Shiao-yin Kuik shared…

【选举】“清除障碍”决策未来 李显龙:此时是大选最佳时期

李显龙总理表示,他今早向哈莉玛总统建议解散国会,因为他认为现在正是大选的最佳时期,能够清除障碍,让新政府能够在未来的五年任期内,集中于恢复国家经济等领域的议程,以及做出艰难的决定。 李总理在全国演说后,于脸书帖文指出,他今早向总统建议解散国会并颁布选举令状,并于6月30日进行候选人提名,而7月10日进行大选投票。 他指出,冠状病毒19之后的复苏工作,将使我国的最大考验之一,因此国民上下必须团结一致。“在当前相对稳定的情况下举办国家选举,将能够清除障碍,赋予政府新的五年任期。然后,我们将能够专注于复苏的议程,并在必须的时候做出艰难决定。” 帖文中,他表示了解民众会担忧疫情复发,对此,选举局将在投票日当天实施一些额外措施,包括增加投票站以减少人潮拥挤的机会、提供选民特定的投票时间、并且给予年长者投票优先权。 “此次的选举将和以往的有所不同,不仅因为疫情,其中还涉及了重大课题。” 他指出,新政府将有责任做出足以影响人民未来生计的决定,甚至会影响国家的未来许多年。“我相信你们会认真思考后明智投票,以确保我们的生活、工作和未来。”