CCL experienced signalling fault during morning rush hour (Source : da_salim Instagram account).

Minister for Transport Khaw Boon Wan has stated that the signalling problem experienced on the Circle Line was caused by a hardware malfunction on one of the trains.
This is the response to a question filed by NCMP Dennis Tan Lip Fong who asked the Minister for Transport in respect of the recent signalling problems with the Circle Line caused by signal interference, what measures will be taken to ensure that commuters are not inconvenienced by the same signalling problems again.
The Minister said that the faulty component has been replaced and the train has since been returned to service under close supervision.
He noted that the Land Transport Authority (LTA) is working with the signalling equipment manufacturer ALSTOM to determine why the component failed, and whether the problem extends to the entire batch of components manufactured. If so, LTA will require ALSTOM to replace all of them.
Based on the findings, Mr Khaw said that LTA will also develop targeted measures to prevent an occurrence of similar problems on both the Circle Line and North-East Line, which use older signalling systems. LTA is also exploring ways to improve the general resilience of these systems. This includes shielding the signalling antenna against spurious signals, incorporating a feature for a backup antenna if the primary one encounters interference, and improving the signal transmission protocol.
He then added that the newer signalling systems used for the Downtown Line, and to be installed for the North-South and East-West Lines and the Thomson-East Coast Line, would not be affected by the signalling problem experienced by the Circle Line as they have enhanced redundancy features to guard against signal interference.
CCL had a couple of signalling fault earlier last year, mainly during morning rush hour, causing commuters to have to wait for hours. The worst occurred in September when the line had the disruption for five days in a row.
Subsequently,  LTA announced that the investigation has traced the source of the signalling problems which plague the CCL to an intermittent failure of the signalling hardware on one train – Passenger Vehicle 46 (PV46).
A joint team comprising LTA, Singapore Mass Rapid Transit (SMRT), the CCL signalling system manufacturer Alstom, the IMDA, DSTA, DSO National Laboratories, GovTech and electro-magnetic interference specialist Rohde & Schwarz found that the intermittent hardware failure had caused about 100 occurrences of loss of signalling communications on trains travelling in the proximity of PV46 between 2 to 6 Nov 2016.

Subscribe
Notify of
0 Comments
Inline Feedbacks
View all comments
You May Also Like

母亲控竹脚妇幼医院将急诊入口“隐秘” 耽误儿子急救时间

每分每秒都是关键!相信大家都会有因家人的不适而前往医院看病,尤其是碰上紧急状况,一分一秒都尤其关键。然而,近日一名母亲却因为找不到急诊室门口,也可能因此耽误了已失去意识的儿子急救时间,导致儿子身亡,令人不胜唏嘘。 该名母亲Juliana Goh 16日在脸书上悲痛地记录儿子不幸离世的过程,并控诉竹脚妇幼医院(KK Women’s and Children’s Hospital)“没有同情心”。 Juliana忆述早在8月24日清晨,儿子因为莫名的头痛和心跳加速而失去意识,于是立即将他送往竹脚妇幼医院,并在10分钟内抵达目的地。 然而,他们在抵达医院后却因灯光灰暗,找不到急诊室门口,最终只能将停在最亮的紧急妇产课中心(Urgent O&G Centre)。根据医院网站表示,该中心是为紧急产科和妇科疾病的女性所设置。…

SDP’s ‘Don’t anyhow say things’ video goes viral, raise questions about promises made by PM Lee during GE2015

Leader of the Singapore Democratic Party (SDP), Dr Chee Soon Juan posted…

PTC: Public transport operators may increase their fares by up to 4.3 percent

The Public Transport Council (PTC) has announced that public transport operators may…

Ex-PAP Minister Jayakumar: WP has gotten its nose into PAP tent

Former senior minister S. Jayakumar, 81, launched his book, “Governing: A Singapore…