In the report released by the Auditor-General’s office on July 26, it is made known that the National Arts Council (NAC) which falls under the governance of Ministry of Community, Culture and Youth (MCCY) paid a considerable sum of consultation fees,$0.41 million on a bin centre that cost $0.47 million, without conducting a cost assessment to ascertain the reasonableness of the fee quoted.

In its audit for Financial Year 2015/2016, AGO carried out test checks on six contracts (total contract value of $139.17 million) for the redevelopment of Victoria Theatre and Victoria Concert Hall (VT/VCH) costing $142.86 million, and found two lapses in the management of contract variations.

Inadequate assessment on the reasonableness of the consultancy fee

AGO stated that there had been inadequate assessment on the reasonableness of the consultancy fee of $0.41 million quoted for the construction of a bin centre; the fee was exceptionally high at 87.2 per cent of the construction cost ($0.47 million). Hence, there was no assurance that the fee paid by NAC was reasonable.

AGO observed that NAC had directly engaged the VT/VCH consultants to provide additional consultancy services (amounting to $0.41 million) for the construction of a bin centre, without first conducting a cost assessment to ascertain the reasonableness of the fee quoted.

AGO is of the view that the consultancy fee, at 87.2 per cent of the construction cost of $0.47 million for the bin centre, was exceptionally high.

Based on the terms of reference for this project, NAC was responsible for seeking approval from its tender board for the engagement of consultants. Thereafter, NAC would seek approval for the drawdown of funds from its supervising ministry.

The project was started when NAC was under the then Ministry of Information, Communications and the Arts (MICA) and taken over by the Ministry of Culture, Community and Youth (MCCY) following a restructuring of MICA. AGO noted that when NAC sought approval for the engagement of consultants, it did not carry out due diligence to assess the reasonableness of the consultancy fee.

AGO’s further checks revealed that when approval was sought for the drawdown of funds, the assessment by the then MICA of the consultancy fee quoted was not robust. Instead of using the norm methodology (that is, percentage of the quoted fee over the construction cost of the works) to assess the reasonableness of the fee, MICA had benchmarked the fee for the construction of the bin centre against other more complex projects. Had the norm been used, it would have been clear that the consultancy fee quoted for the bin centre was exceptionally high.

NAC explained that it had worked with its supervising ministry on this project and relied on the ministry’s cost assessment. Going forward, NAC would ensure that the relevant cost assessments are included when seeking approval from its approving authorities for procurement.

MCCY informed AGO that the construction of the bin centre for this project was more complex and required significantly more design expertise, technical consultancy services and effort to coordinate with multiple parties and these were the reasons for the fee to be above the norm.

It acknowledged that the cost assessment could have been more robust.

However, AGO noted that these reasons were not cited in the approval paper for the drawdown of funds and that there was also no documentary evidence that these reasons were indeed considered at the material point in time.

MCCY also informed AGO that it would adopt the norm for cost assessment of consultancy fees for future development projects and provide justifications where there are good grounds for deviation from the norm.

No approval sought for variations (costing $4 million) under two construction contracts 

AGO’s review of 164 variations (amounting to $8.73 million) under two construction contracts revealed 47 variations (estimated at $4 million) that were carried out before approvals were obtained.

The delays in obtaining approval ranged from 12 days to 3.5 years.

In addition, AGO noted that for 38 variations, the approval papers did not highlight that the works had already commenced or were already completed and that covering approvals were being sought. The large number of covering approvals indicated a breakdown in the controls put in place to ensure that variations were properly justified and approved before works commenced. The role of the approving authority was also undermined.

AGO states that the role of the approving authority must not be regarded as perfunctory. If alerted on a timely basis, the approving authority can implement cost control measures to ensure that financial prudence and discipline is maintained. It is therefore important to seek approval on a timely basis and to disclose pertinent facts for approving authorities to make informed decisions.

NAC explained that the lapses were due to the external consultants’ delays in submitting the requests for variation works for NAC’s approval.

Going forward, NAC would put in place measures to ensure that consultants comply with the requirement to obtain approvals before variation works are carried out.

AGO in its remarks on the lapse, noted to NAC that it is accountable for the public funds spent and is responsible for maintaining adequate oversight of the project, including its consultants.

Subscribe
Notify of
0 Comments
Inline Feedbacks
View all comments
You May Also Like

Saudi National Bank chair resigns after Credit Suisse buyout: statement

The chairman of Saudi National Bank, Ammar AlKhudairy, has resigned due to personal reasons, according to a statement. The bank was the main shareholder of Credit Suisse before its recent buyout, and AlKhudairy’s comments about not raising the bank’s stake caused the latter’s shares to plummet.

明星律师殴打女员工今被控,或判两年以上监禁

日前明星律師萧丁明涉殴打两名员工,今日以故意伤害罪等4项刑事罪名被提控上庭。 根据《亚洲新闻台》报道,去年4月17日,他被指抓伤侄女的手臂,并将他推向桌子,还出手赏了他好几次耳光;另外,他也涉嫌将一名女员工推倒,并对着另一名女员工戳额头;他也曾涉嫌出言“我会拿刀杀了你”,威胁员工。 一开始,萧丁明与女员工争执的音频于去年5月曝光,当时已引起社会哗然;而相隔一年后,一段萧丁明殴打两名女员工的视频又再网上曝光,引起了法律界的轰动。 今日该名涉嫌多项罪名的律师出席法庭时,面容憔悴。 现年46岁的萧丁明,是萧丁明律师事务所的经理。并且开设光线演艺经纪公司(Beam Artistes)。去年五月消息蒲曝光后,萧丁明曾与受害人互相提告对方,但最后双方均撤销告诉。随后萧丁明也在脸书上发表声明表示,他已接受教训,也希望能够接受他的歉意。 但相隔一年后,即是今年4月,萧丁明又被踢爆殴打员工的视频,他说明,并不了解爆料者的用意,他想要完成什么目的。他续指,他确实感到非常压力,因为要同时经营三家公司,对于一个企业家而言,时间就是持续不断的施加压力给他。 “我知道这不是借口,但已过去一年,涉案人员也达成和解,也希望能将此时翻篇。” 他表示,希望能尽快了结此事,让他的生活能够继续也让这些不断要伤害我的人最终都能落下帷幕。他将在下月回庭继续审理。 根据故意伤害罪,一旦罪成,萧丁明将可能被判两年监禁,罚款5000新元或两者兼施;而使用暴力罪则一经裁定,可判处3个月监禁,罚款1500新元或两者兼施。 萧丁明曾有殴打员工记录 去年,一个长约30分钟,发生在萧丁明律师事务所的打人视频在网上流传。其中光线演艺经纪公司女员工还报警,指控萧丁明抓住和推她等。随后双方达成和解,彼此都于去年5月撤回彼此的报案。…

9 July 2011: IPS Post-Election Forum Speech on Party Renewal

I attended a very thought-provoking conference at the invitation of the Institute…

应对疫情措施 本地佛教组织改脸书直播庆卫塞节

迎接卫塞节的到来,新加坡佛友会(Buddhist Fellowship)、新加坡佛教总会基于冠状病毒防疫措施、民众的健康安全着想,明天改为通过社交媒体脸书直播庆祝活动。 至于新加坡佛教总会会长广品法师,则向本地社区和客工佛教徒致以祝福。由于寺庙因新冠肺炎阻断措施而关闭,奉献者可在5月7日上午10点至下午4点,在脸书观赏新加坡佛教总会举办的活动。 佛友会也在媒体声明中指出,配合政府制定的阻断措施,今年的卫塞节庆祝活动将在网上进行,活动包括有通讯及新闻部长易华仁致辞、澳大利亚珀斯Bodhinyana修道院高僧Ajahn Brahmali主讲。有关直播活动是从早上9时开始至晚上8时15分。 卫塞节庆祝活动将在脸书专页直播。欲知详情可到佛友会官网(https://www.buddhistfellowship.org/bfwp425/events/vesak-2020-buddhism-in-a-new-decade/)查询。 新加坡佛教总会卫塞节脸书直播:https://www.facebook.com/SBFeVesak/