Workers' Party Logo
Workers’ Party Logo

The Workers’ Party has released a party statement on the recent train disruption along the entire North-South and East-West MRT line, stating that the party is deeply worried over the 3.5 hour disruption of train service and the severe inconvenience caused to an estimated 250,000 commuters during the evening rush hour.

The party recommended for a more rigorous enforcement of maintenance regime on the rail network, with measures to ensure that commuters’ interests take precedence over corporate profits.

The party also calls upon engineering and front-line staff be provided with proper support by their employers to ensure that they are equipped to handle any similarly challenging situations in the future.

The full statement by Workers’ Party below

The Workers’ Party is deeply worried over the 3.5 hour disruption of train services along the entire stretch of both the North-South and East-West MRT lines on 7 July 2015. The severe inconvenience caused to an estimated quarter-of-a-million commuters during the evening rush hour makes this the most serious MRT disruption in Singapore’s history.

The latest breakdown comes on the heels of repeated assurances by both SMRT and the authorities about the improved reliability of our transport system. Yet, the number of significant train delays reached an all-time high of 12 in 2014 and stands at 8 in 2015. This is despite billions of dollars of government funds being pumped into improving the existing MRT infrastructure since 2011.

Even as the LTA and SMRT work together with their engineers and external consultants to identify the precise cause of the breakdown, we find it particularly troubling that two of our country’s main rail lines can be fully disrupted by what appears to be an electrical fault. This raises questions about our transport system’s resilience, particularly as such a system-wide failure could have repercussions on our nation’s economic and national security interests.

We call on the authorities to enforce a more rigorous maintenance regime on the rail network, with effective measures in place to ensure that commuters’ interests take precedence over corporate profits. For key performance indicators (KPIs) such as the number of unscheduled train withdrawals per 100,000 train kilometres and the number of service delays exceeding 30 minutes, concrete targets must be set and disclosed to the public.

In the meantime, engineering and front-line staff should also be provided with proper support by their employers to ensure that they are equipped to handle any similarly challenging situations in the future. Their efforts and tireless work – many working through the night – should be recognised, and we would like to express our appreciation for their hard work.

Subscribe
Notify of
0 Comments
Inline Feedbacks
View all comments
You May Also Like

MAS seeks public feedback on proposed new legal tender limit for coins

Monetary Authority of Singapore (MAS) is seeking public feedback on the proposed new…

【武汉冠状病毒】本地今增47确诊 20日晚起入境者都需遵守居家通知

根据卫生部文告,本地今日(18日)新增高达47起武汉冠状病毒(COVID-19)确诊病例,其中有30位病患都是返国的新加坡居民。 有鉴于此,政府呼吁国人延后所有出国行程。从周五(20日)晚11时59分起,凡是入境我国的公民、永久居民和长期准证持有者,都要遵守14天居家通知(Stay Home Notice)。 这意味着,本地确诊病例已增至313人,新增病例中还有五人感染源头未明。卫生部指出,过去三天,近七成病例都是入境病例,且多是从海外返国的我国公民,或长期准证持有者。 昨日我国新增确诊病例多达2人,前日则是17人。 我国是在本月15日,呼吁国民推迟非必要行程。来自中国、法国、德国、伊朗、意大利、韩国、西班牙等国人士,不准入境/过境我国。 新措施下,入境我国人士需申报他们14天居家通知的所在位置(如酒店、住所或亲属住处等)。 至于国务资政兼国家安全统筹部长张志贤,以及马国高级部长伊斯迈领导的新马联合工作小组,将商讨如何确保和维系新马民众、服务和物资物流的安全。 3月18日新增47例确诊病例图表 备注:NCID(国家传染病中心);WP(工作准证持有者);LTP(长期准证持有者) 病例…

Eight men own the same wealth as the poorest half of the world

There is a new estimation which shows that just eight men own…

PUB issues default notice to Hyflux’s Tuaspring

A default notice to Tuaspring Pte Ltd (TPL), a subsidiary of Hyflux,…